The Transportation Safety Board of Canada (TSB) has released its investigation report (P14H0011) into the 25 January 2014 rupture of a TransCanada PipeLines Limited pipeline. A 30-inch natural gas pipeline, Line 400-1, ruptured and ignited at the site of Mainline Valve 402 near Otterburne, Manitoba. The escaping gas burned for approximately 12 hours. Five residences in the immediate vicinity were evacuated until the fire was extinguished.

The investigation determined that Line 400-1 failed due to a fracture that occurred at a pre-existing crack that had remained stable for over 50 years prior to the occurrence. This crack had formed at the time of the pipeline's construction likely due to an inadequate welding procedure and poor welding quality. There was no requirement for inspections of every weld by radiography at the time of the pipeline's original construction.

The fracture was caused by incremental stresses to the pipeline, which were likely due to a combination of factors. These included: weakened soil support in the area due to maintenance activities over the years; record low temperatures that winter; recent work at and around the valve site that may have driven frost deeper into the ground; and thermal contraction that may have occurred when the pipeline cooled due to the absence of gas flow for 20 days prior to the occurrence.

Following the occurrence, the National Energy Board required TransCanada to perform several engineering assessments along Line 400-1. TransCanada performed numerous excavations, inspections and repairs along Line 400-1 before returning it to service. Following the pipeline's return to service, TransCanada performed in-line inspections to rule out other threats to the pipeline's integrity. 

More from Industry News

Caterpillar Oil and Gas introduces HMI panel for gas compression products

Caterpillar Oil & Gas is pleased to announce the next generation of human-machine interface (HMI) panels available as an integrated component on select gas compression models. The easy to use touchscreen display performs the functions of the customer version of Cat Electronic Technician. Now, with the HMI panel integration, controlling the engine and monitoring the system's status is at the users' fingertips. The new HMI panel is now available on the CG137-8 and will be released as an offering for additional gas compression models at a later date.

New B.C. gas processing facility opened by Black Swan Energy

Black Swan Energy Ltd. has officially opened its Nig Creek Gas Processing Facility located in northeast British Columbia. The company hosted a celebration at the plant which was attended by the Chief of the Blueberry River First Nations, Marvin Yahey, Mayor of Fort St. John and 2019 Canadian Energy Person of the Year, Lori Ackerman and Liberal MLA for Peace River North, Dan Davies. Following a tour of the state-of-the-art facility Elder May Apsassin offered a blessing, which highlighted the importance of actively engaging with our First Nations partners.

Rangeland kicks off construction of Marten Hills pipeline system

Rangeland Midstream Canada, Ltd., a wholly owned subsidiary of Rangeland Energy III LLC, has commenced the construction of its Marten Hills Pipeline System. The system consists of new crude oil and condensate pipelines located in the Marten Hills region of north central Alberta. The Marten Hills Pipeline System will extend approximately 85 kilometres (52.8 miles), terminating at an interconnect with Plains Midstream Canada's Rainbow Pipeline System, which serves the Edmonton, Alberta, hub and refining market (system map here). The Marten Hills system is expected to come into service in the second quarter of 2020.

Greenfield Global takes next steps to expand production at its Varennes biorefinery

Greenfield Global Inc., Canada's largest ethanol producer and a world leader in high-purity specialty alcohols, welcomed the Government of Quebec's pre-publication of draft regulations on the minimum volume of renewable fuel in gasoline and diesel fuel. Announced this week, the government's proposal would set blending thresholds of 10% renewable fuel in gasoline and 2% in diesel fuel by 2021 and increase the thresholds to 15% in gasoline and 4% in diesel fuel, respectively, by 2025.

Suncor Energy increases participation in Enerkem, strengthening existing relationship

Enerkem Inc., the world-leading waste-to-biofuels and chemicals producer, has announced the closing of a $50 million equity investment from Suncor. As Canada's leading integrated energy company, Suncor first participated in the ownership of Enerkem in April 2019 as part of a $76.3 million equity financing alongside Enerkem's existing shareholders. With this new investment, Suncor becomes a significant, strategic shareholder of Enerkem.

Subscribe to our free newsletter

Get our newsletter

Learn more

CAS DataLoggers provide unique safety support in chemical plant

CAS DataLoggers provided a unique gas monitoring and temperature monitoring solution for an international chemical company, where health and safety was an important consideration. Harmful gas detection was placed high on the list of priorities: hydrochloric acid gas was produced when a standard chemical made by the company leaked to the atmosphere as fumes, while chlorine was used as a raw material at the plant. Therefore, it was necessary to monitor and record both hydrochloric acid gas levels (HCL) and chlorine (CH2) levels. 

Alberta launches support for indigenous groups to enter energy sector

Alberta Bill 14, the Alberta Indigenous Opportunities Corporation Act introduced recently, would set up a first-of-its-kind Crown corporation to facilitate Indigenous investments and job creation. The AIOC would make it easier for Indigenous communities to access funding, invest in major natural resources development projects and fuel their prosperity while helping to grow Alberta's natural resource sectors.

C3 Oleflex technology helps with first contract for propane dehydrogenation technology in Turkey

Honeywell announced that Ceyhan Polipropilen Üretim A.Ş. will use Honeywell UOP's C3 Oleflex technology to produce 457,000 metric tons per year of polymer-grade propylene for a new petrochemicals complex in Ceyhan, Turkey. Ceyhan Polipropilen Uretim is a joint venture of Rönesans Holding and the Algerian national energy company Sonatrach S.p.A. The new unit will be used to supply propylene for production of polypropylene, which is used to make a wide variety of plastic products that are growing in demand globally.

September 2019 international rig count released by Baker Hughes

Baker Hughes, a GE company announced that the Baker Hughes international rig count for September 2019 was 1,131, down 7 from the 1,138 counted in August 2019, and up 127 from the 1,004 counted in September 2018. The international offshore rig count for September 2019 was 242, down 2 from the 244 counted in August 2019, and up 38 from the 204 counted in September 2018. 

TransAlta, SemCAMS Midstream to build Alberta cogeneration plant

TransAlta Corporation and SemCAMS Midstream ULC, a subsidiary of SemGroup Corporation, have entered into definitive agreements to develop, construct and operate a new cogeneration facility at the Kaybob South No. 3 sour gas processing plant. The Kaybob facility is strategically located in the Western Canadian Sedimentary Basin and accepts natural gas production out of the Montney and Duvernay formations. TransAlta will construct the cogeneration plant which will be jointly owned, operated and maintained with SemCAMS. The capital cost of the new cogeneration facility is expected to be approximately $105 million and the project is expected to deliver approximately $18 million in annual EBITDA. TransAlta will be responsible for all capital costs during construction and, subject to the satisfaction of certain conditions, SemCAMS will purchase a fifty percent (50%) interest in the new cogeneration facility as of the commercial operation date, which is targeted for late 2021.

Subscribe to our free magazine

Get Our Magazine

Paper or Digital delivered monthly to you

Subscribe or Renew Learn more

Universal mCloud offers 3D digital twin capabilities to Alberta customers

Universal mCloud Corp. (TSX-V: MCLD) (OTCQB: MCLDF) ("mCloud"   or the "Company"), a leading provider of asset management solutions combining IoT, cloud computing, artificial intelligence ("AI") and analytics, today announced the launch of a new AssetCare™️ solution under the banner of the "3D Digital Twin." This solution enables mCloud to take advantage of high-precision 3D laser scanners to create digital replicas of facilities along with a suite of capabilities designed to use these 3D models to streamline field work, minimize facility downtime, and eliminate unnecessary field visits.

Armor cladding alloy now available from Schlumberger for drill bits

Smith Bits, a Schlumberger company, has introduced Aegis armor cladding that significantly improves bit body design flexibility and erosion resistance, increasing rate of penetration (ROP) and bit durability for longer runs. Composed of a proprietary tungsten carbide material, Aegis cladding increases bit erosion resistance by 400% and strength by 40% when compared to conventional matrix polycrystalline diamond compact (PDC) bits.

Melius Energy successfully tests new bitumen shipping approach

Calgary based Melius Energy has successfully transported bitumen from Edmonton, Alberta to Prince Rupert, British Columbia, continuing to global markets in custom 20-foot shipping containers utilizing intermodal rail and vessel infrastructure. The shipment is the company's first BitCrude transportation process demonstration, proving the ability to move bitumen safely and efficiently, in adherence to Canada's regulatory framework.    

Advanced production modeling and reservoir engineering software solutions from Emerson on display

Emerson will showcase its advanced Exploration & Production (E&P) software solutions for optimizing Production Modeling and Reservoir Engineering workflows at the Society of Petroleum Engineers Annual Technical Convention and Exhibition in Calgary, September 30 - October 2.  Daily demonstrations at booth #819 will highlight Emerson's technologies for solving subsurface and surface challenges, to reduce uncertainty and enhance confidence in drilling decisions.

Pipestone gas plant officially commissioned by Tidewater

Tidewater Midstream and Infrastructure Ltd. has announced that it completed commissioning and start-up of the Pipestone Montney sour deep-cut gas processing complex.  The Pipestone Gas Plant is designed to process approximately 100 MMcf/day of sour gas and includes an acid gas injection well, salt water disposal well, and pipelines that directly connect to Tidewater's Pipestone Gas Storage Facility.  Additionally, the Pipestone Gas Plant is connected to both the Alliance and TC Energy pipeline network.

Subscribe to our free newsletter

Get our newsletter

Learn more

$2 billion TransAlta energy investment move to include natural gas over coal

TransAlta Corporation has introduced its Clean Energy Investment Plan, which includes converting its existing Alberta coal assets to natural gas and advancing its leadership position in renewable energy. The total cost of the plan is expected to be approximately $2 billion which includes approximately $800 million of renewable energy projects already under construction.

Oversupply of natural gas to push U.S. prices sharply down: IHS Markit

A persistent oversupply of natural gas will drive the 2020 average price at the Henry Hub down (in real terms) to a level not seen in decades, according to new report from IHS Markit. The oversupply—to be reinforced by a new surge in associated gas production from the Permian basin—will push the average price down below $2/MMBtu for the year, IHS Markit said. That is the lowest prices have averaged in real terms since the 1970s. In nominal terms, the last time that prices fell below $2 was 1995.

Subscribe to our free magazine

Get Our Magazine

Paper or Digital delivered monthly to you

Subscribe or Renew Learn more