Oil & Gas Product News Logo

Lift optimization software allows for greater value from existing assets

Lift optimization software allows for greater value from existing assets

Company info

8100 W Florissant Ave
St. Louis, MO
US, 63136

Website:
emersonprocess.com

Read more

Energy producers seeking to maximize production from proven reserves now have access to next-generation artificial lift optimization solutions from Emerson.

The Dynamic Lift Optimization (DLO) software allows producers to extract greater value from existing assets and reduce field decline rates by ensuring a field or platform is producing at maximum efficiency given current production constraints. Using the DLO software, a typical site operating multiple wells can experience a 10 percent production improvement because it responds immediately to changes in the field operation, continually reallocating available lift resources. DLO software is one of the technologies featured by Emerson at this year’s Offshore Technology Conference, May 1-4 in Houston.

DLO software can impact the industry at a critical time. Energy producers seek to maximize the productivity of existing wells and offset the natural decrease in production from an oil well over time. As decline rates increase and wells produce less oil, energy producers are forced to find alternative methods to meet production targets, preferably without the added cost of drilling new wells.

DLO software dynamically adjusts lift gas flows or electric submersible pump (ESP) speed based on the most recent well test curves. Once configured, the application optimally allocates the available lifting power to the wells to maximize production, at the same time adjusting to changing conditions such as wells coming on or off or compressor trips. By contrast, traditional gas lift adjustments are typically handled manually and infrequently, resulting in missed opportunities and lower field performance.

Earlier versions of the software have helped oil and gas producers generate millions of dollars per year in increased production throughout the last decade. The new version is easier to implement and comes IIoT-ready allowing cloud-based infrastructure. The new graphical user interface enables production engineers to safely and securely access crucial field optimization data from any location with an internet connection.

In addition to a new user-friendly, web interface, the DLO software now uses the OSIsoft PI System - a highly scalable open data infrastructure and historian that provides a common data architecture from the plant floor to the enterprise level - making information available wherever needed for better business decisions.

“Emerson’s Dynamic Lift Optimization software is the first of its kind that helps production teams dynamically adjust lift rates closed-loop based on current conditions, ensuring efficient, high-yield recovery,” said Jose Jimenez, director for Emerson Automation Solution’s global O&G industry business. “It is critical to direct lift resources precisely to the highest value wells, and Emerson’s optimization solution has proven to increase oil recovery rates and slow well decline rates. The new software platform lowers implementation cost significantly.”

Since DLO utilizes well test curves to determine how to allocate lift resources, it’s important that these curves are updated as the well declines. For maximum benefit, oil producers have the option of pairing DLO technology with Emerson’s integrated well testing solution, which allows for more frequent updating of well curves – information that is fed to DLO software to ensure field production is continuously maximized.

The integrated well testing solution consists of a multi-port flow selector, a 3-phase flow meter and a full-featured remote terminal unit that is delivered as a pre-engineered and fabricated on a skid. This improves the quality and frequency of well test data with a significantly reduced footprint and weight as compared to a traditional test separator and manifold. Each skid can handle up to seven wells, significantly eliminating piping, valves and vessels. The 3-phase flow meter provides instantaneous readings for the oil, gas and water from that well, eliminating the settling time required for a traditional test separator. The well test schedule can be programmed in advance and can occur without manual intervention, eliminating the need for an operator to manually line up valves.

Together, DLO software and integrated well testing solutions offer producers enhanced capabilities for gathering real-time data from the field, automating the well test procedures and closed-loop optimization of lift rates based on current field conditions and operating constraints. This solution automatically allocates available lift resources, where they have the most potential to drive additional profit.

More from Drilling & Production

Cenovus delivers strong performance through Q1 of 2019

Cenovus Energy Inc. delivered strong operating and financial performance in the first quarter of 2019, generating more than $1 billion of adjusted funds flow, $731 million of free funds flow and cash from operating activities of $436 million. The company's excellent financial results were driven by strong operating performance, a significant narrowing of light-heavy oil price differentials in early 2019 and Cenovus's low-cost structure and continued commitment to capital discipline.

Single Phase Power Solutions introduces single phase pump solutions

Single Phase Power Solutions (SPPS), the world's only manufacturer of high horsepower single phase electric motors, introduces single phase pump solutions which do not require a phase converter or Variable Frequency Drive (VFD).  The company incorporates their Belle Single-Phase Motor which uses Written-Pole technology to deliver up to 100 hp to power standard suction end centrifugal pumps, rotary gear pumps, and turbine pumps in both horizontal and vertical configurations.  

Saturn provides operational update, reports more than 1,400 bbl/day production

Saturn Oil & Gas Inc. is pleased to announce finishing successfully the drilling, completion, equip and tie-in of its nine (9) wells in Q1 2019. Saturn has achieved an average production rate in March 2019 of over 1,100 bbl/d with all twenty-nine (29) wells producing by March 25th. The Q1 2019 peak production rate was over 1,400 bbl/day. The Company forecasts its Q2 2019 production volumes will average over 950 bbl/d. 

free-paper-airplane

Get our newsletter

Learn more

Tourmaline adds reserves through 2018

Tourmaline Oil Corp. is pleased to report very strong total reserve growth, liquids reserve growth and a continued reserve value increase in the current depressed natural gas price environment.  The Company executed on the 2017-2018 plan to concentrate almost entirely on internal EP growth and has produced the best reserve metrics in the Company's 10 year history over the past two years.

Netzsch adds xLC stator adjustment to triple service life of pumps

Another component has been added to the product portfolio of the NEMO progressing cavity pump from NETZSCH: the xLC unit. This unit triples the service life of the pump, particularly when conveying difficult, abrasive media. When wear occurs in the rotor-stator system, the new xLC unit allows the performance of the pump to be re-established by adjusting the preload between the conveyor elements. 

Rockwell, Schlumberger start joint venture to create integrated automation solutions provider

Rockwell Automation, which is dedicated to industrial automation and information, and Schlumberger, a leading provider of technology for reservoir characterization, drilling, production, and processing to the oil and gas industry,  have entered into an agreement to create a new joint venture, Sensia, the first fully integrated digital oilfield automation solutions provider.

free-magazine-subscription

Get Our Magazine

Paper or Digital delivered monthly to you

Subscribe or Renew Learn more

Deteriorating investor confidence in Canada causes cut in PSAC 2019 forecast

In its first update to the 2019 Canadian Drilling Activity Forecast, the Petroleum Services Association of Canada (PSAC) has revised the number of wells drilled (rig released) across Canada for 2019 to 5,600 wells. This represents a decrease of 1,000 wells, or 15 percent, from PSAC's original 2019 drilling Forecast released in November 2018 and reflects the deteriorating investor confidence in Canada.  

Interventek launches Revolution PowerPlus safety valve technology at Subsea Expo

Subsea oil and gas engineering firm Interventek will unveil the development of the industry's first subsea shear-and-seal safety valve powered by an integrated gas accumulator at next week's Subsea Expo show in Aberdeen, UK. This innovation builds on Interventek's existing, award-winning, Revolution valve technology by adding a gas accumulator within the valve, close to the cutting and sealing mechanism. It increases the power and speed of the valve's functionality and provides a failsafe mode triggered in the event of an emergency. 

free-paper-airplane

Get our newsletter

Learn more

Subsea Integration Alliance receives EPCIC contracts offshore Australia

Subsea Integration Alliance has announced the award of integrated subsea engineering, procurement, construction, installation and commissioning (EPCIC) contracts. These awards, by Esso Australia Pty Ltd, represent the first integrated subsea project for Subsea Integration Alliance in Australia combining OneSubsea and Subsea 7 expertise in subsea production systems (SPS) and subsea umbilical, riser and flowline (SURF) systems.

Suncor Energy provides fourth quarter 2018 operations update

Suncor has provided an operations update for the fourth quarter of 2018, highlighting total upstream production of 831,000 barrels of oil equivalent per day (boe/d), which is a quarterly production record and represents an increase of 12% from the third quarter of 2018.  This record-breaking quarter reflects the results of the significant investment developing Fort Hills, and Suncor's ongoing operational excellence focus across its assets, particularly at the Syncrude joint venture.

CPC-Cryolab announces 5000 Series cryogenic valves

CPC-Cryolab, a CIRCOR International brand, offers the 5000 Series Cryogenic Valves, ideal for use in ultra-cold cryogenic storage tanks, transportation trailers, and vacuum jacketed and non-jacketed piping systems. The 5000 Series valves feature bellow sealed and non-bellows sealed designs, redundant packaging seals, and all stainless-steel construction, trusted the most common, most reliable LHe valves used on ISO helium containers world-wide.

Pulse Oil Corp. announces second well drilling operations completed at Queenstown Light Oil Field

Pulse Oil Corp. announces that on December 27th, 2018, drilling of Pulse's second exploration well, PUL HZ QUEENSTN 12-9-19-21 W4 ("12-9"),  reached a total measured depth, as planned, of 2957m (TVD 1389m), including 1237m of lateral section within a highly porous Mannville-aged Lithic sandstone channel. The 12-9 well was Pulse's second well successfully targeting a new 3-D seismic interpretation intended to focus on the highest porosity / permeability lithic deposits within the Mannville channel trend in the Queenstown area of Southern Alberta.

free-magazine-subscription

Get Our Magazine

Paper or Digital delivered monthly to you

Subscribe or Renew Learn more