Oil & Gas Product News Logo

Gyrosphere MEMS gyro-while-drilling from Schlumberger increases efficiency

Gyrosphere MEMS gyro-while-drilling from Schlumberger increases efficiency

Company info

1325 S. Dairy Ashford Dr.
Houston, TX
US, 77077

Website:
slb.com

Read more

Schlumberger introduced the GyroSphere MEMS gyro-while-drilling service at Offshore Northern Seas (ONS). The GyroSphere service responds to the needs of E&P companies for a faster and more rugged, gyro-surveying while-drilling tool that increases drilling efficiency and reliability while reducing drilling risks.

As the first application of microelectromechanical system (MEMS) technology for gyro surveying while drilling in the oilfield, the GyroSphere sensor performs gyro surveys faster than conventional systems and avoids the need for recalibration between runs. Solid-state technology enables the GyroSphere sensor to withstand the downhole shock and vibration that occur during drilling beyond the limits of current gyro technologies. Additionally, the GyroSphere service can reduce gyro survey uncertainty by up to 45%, providing more accurate access to smaller reservoir targets.

"The GyroSphere service substantially improves operational efficiency by enabling gyro surveying without taking any additional rig time," said Tarek Rizk, president, Drilling & Measurements, Schlumberger. "Two surveys can be completed using the GyroSphere service in the same amount of time conventional gyros take to start just one."

The GyroSphere service has been proven through extensive testing and field trials in the North Sea, Ecuador, Africa, and Russia. In Russia, the GyroSphere service enabled a customer to avoid wellbore collisions while accessing reservoirs from existing structures, eliminating drilling risks associated with deploying conventional gyro surveys.

More from Drilling & Production

Tourmaline adds reserves through 2018

Tourmaline Oil Corp. is pleased to report very strong total reserve growth, liquids reserve growth and a continued reserve value increase in the current depressed natural gas price environment.  The Company executed on the 2017-2018 plan to concentrate almost entirely on internal EP growth and has produced the best reserve metrics in the Company's 10 year history over the past two years.

Netzsch adds xLC stator adjustment to triple service life of pumps

Another component has been added to the product portfolio of the NEMO progressing cavity pump from NETZSCH: the xLC unit. This unit triples the service life of the pump, particularly when conveying difficult, abrasive media. When wear occurs in the rotor-stator system, the new xLC unit allows the performance of the pump to be re-established by adjusting the preload between the conveyor elements. 

free-paper-airplane

Get our newsletter

Learn more

Rockwell, Schlumberger start joint venture to create integrated automation solutions provider

Rockwell Automation, which is dedicated to industrial automation and information, and Schlumberger, a leading provider of technology for reservoir characterization, drilling, production, and processing to the oil and gas industry,  have entered into an agreement to create a new joint venture, Sensia, the first fully integrated digital oilfield automation solutions provider.

Deteriorating investor confidence in Canada causes cut in PSAC 2019 forecast

In its first update to the 2019 Canadian Drilling Activity Forecast, the Petroleum Services Association of Canada (PSAC) has revised the number of wells drilled (rig released) across Canada for 2019 to 5,600 wells. This represents a decrease of 1,000 wells, or 15 percent, from PSAC's original 2019 drilling Forecast released in November 2018 and reflects the deteriorating investor confidence in Canada.  

Interventek launches Revolution PowerPlus safety valve technology at Subsea Expo

Subsea oil and gas engineering firm Interventek will unveil the development of the industry's first subsea shear-and-seal safety valve powered by an integrated gas accumulator at next week's Subsea Expo show in Aberdeen, UK. This innovation builds on Interventek's existing, award-winning, Revolution valve technology by adding a gas accumulator within the valve, close to the cutting and sealing mechanism. It increases the power and speed of the valve's functionality and provides a failsafe mode triggered in the event of an emergency. 

free-magazine-subscription

Get Our Magazine

Paper or Digital delivered monthly to you

Subscribe or Renew Learn more

Subsea Integration Alliance receives EPCIC contracts offshore Australia

Subsea Integration Alliance has announced the award of integrated subsea engineering, procurement, construction, installation and commissioning (EPCIC) contracts. These awards, by Esso Australia Pty Ltd, represent the first integrated subsea project for Subsea Integration Alliance in Australia combining OneSubsea and Subsea 7 expertise in subsea production systems (SPS) and subsea umbilical, riser and flowline (SURF) systems.

Suncor Energy provides fourth quarter 2018 operations update

Suncor has provided an operations update for the fourth quarter of 2018, highlighting total upstream production of 831,000 barrels of oil equivalent per day (boe/d), which is a quarterly production record and represents an increase of 12% from the third quarter of 2018.  This record-breaking quarter reflects the results of the significant investment developing Fort Hills, and Suncor's ongoing operational excellence focus across its assets, particularly at the Syncrude joint venture.

CPC-Cryolab announces 5000 Series cryogenic valves

CPC-Cryolab, a CIRCOR International brand, offers the 5000 Series Cryogenic Valves, ideal for use in ultra-cold cryogenic storage tanks, transportation trailers, and vacuum jacketed and non-jacketed piping systems. The 5000 Series valves feature bellow sealed and non-bellows sealed designs, redundant packaging seals, and all stainless-steel construction, trusted the most common, most reliable LHe valves used on ISO helium containers world-wide.

Pulse Oil Corp. announces second well drilling operations completed at Queenstown Light Oil Field

Pulse Oil Corp. announces that on December 27th, 2018, drilling of Pulse's second exploration well, PUL HZ QUEENSTN 12-9-19-21 W4 ("12-9"),  reached a total measured depth, as planned, of 2957m (TVD 1389m), including 1237m of lateral section within a highly porous Mannville-aged Lithic sandstone channel. The 12-9 well was Pulse's second well successfully targeting a new 3-D seismic interpretation intended to focus on the highest porosity / permeability lithic deposits within the Mannville channel trend in the Queenstown area of Southern Alberta.

free-paper-airplane

Get our newsletter

Learn more

Petroshale announces financial and operating results for the third quarter of 2018 and executive appointment

PetroShale Inc. has announced its financial and operating results for the three and nine month periods ending September 30, 2018. In addition, the Company announces the appointment of Mr. Caleb Morgret as Chief Financial Officer (CFO), who will assume the role from Mr. David Rain, who is retiring effective November 30, 2018. 

BHGE Subsea Connect offers potential to unlock more offshore oil

Baker Hughes, a GE company announces the launch of its new approach to subsea development: Subsea Connect, including its Aptara TOTEX-lite subsea system, a suite of new lightweight, modular technologies designed for the full life of field. By combining planning and risk management, new modular deepwater technology, innovative partnerships and digital tools into a single offering, Subsea Connect can reduce the economic development point of subsea projects by an average of 30 percent and has the potential to unlock an additional 16 billion barrels of reserves globally.

"Dysfunctional" oil and gas industry brings challenges for drillers: CAODC forecast

Despite a recovery in the price of oil, and LNG Canada's positive announcement early in Q4 that it would be building its LNG export facility, drilling activity in 2018 remained flat year-over-year. Once again the politicization of oil and gas infrastructure in Canada, along with increased taxation and regulatory requirements, resulted in significant delays and additional costs for Canadian producers, and sustained price differentials for Canadian crude blends. 

free-magazine-subscription

Get Our Magazine

Paper or Digital delivered monthly to you

Subscribe or Renew Learn more