Between the Road and the Load

Talbert's 60CC/55SA-LD trailer pairs with the company's optional East Coast-style E1Nitro axle extension, allowing for 60-ton capacity with a close-coupled configuration or a 55-ton hauling capacity with a spread axle configuration.
Talbert's 60CC/55SA-LD trailer pairs with the company's optional East Coast-style E1Nitro axle extension, allowing for 60-ton capacity with a close-coupled configuration or a 55-ton hauling capacity with a spread axle configuration.

Long before a single load is booked or any wheels turn, someone - usually a fleet manager - needs to determine exactly what is going to separate the road and the load. There's a lot riding on this decision because, as much as some would like to think otherwise, a trailer is never just a trailer. It can be manufactured to many different specifications, with multiple raw material options, dozens of load and geographical considerations, various top speed requirements and hundreds of possible axle configurations coming into play. And it all comes down to one objective - the ideal trailer for an operation's specific loads.

To select the right trailer, the one that will require the least amount of maintenance, provide the greatest lifespan and deliver the highest possible return on investment, it is vital to understand the most important factor of all - capacity.

50 Tons in the Making
There are five contributors to capacity ratings. They apply to any kind of open trailer, from flat and step decks to lowbeds, and each can be varied to meet a carrier's specifications.

It begins, of course, with the materials used to build the trailer, specifically their sizes and weights. From there, capacity encompasses the overall weight that a trailer can carry, the area of the deck in which it can carry that weight, the speed at which the trailer will generally travel and the safety factor. 

To make an apples-to-apples comparison, consider one 50-ton lowbed alongside another 50-ton lowbed. Because, just as a trailer is never just a trailer, not all 50-ton lowbeds are created equal.

Load Concentration:  Half Deck, Full Utilization
There are more than 50 manufacturers of lowbed heavy-haul trailers in North America, and they apply several methods of rating the capacity of their trailers.  Since there is no industry-set or government-mandated system, it's up to every buyer to be in tune with the method each manufacturer uses before making a purchase decision. 

A key difference between manufacturers' ratings comes in load concentration, or the length of the deck that can handle the rated weight. Obviously, a 26-foot, 50-ton lowbed can haul 50 tons. But how much of the deck those 50 tons occupy is just as important as the weight itself. Whereas one trailer might need the entire length of the deck to be rated at 50 tons, another can be rated for 50 tons in a 16-foot span, and another can handle that same weight in half the deck length.

For example, a 26-foot, 50-ton lowbed might be rated for the trailer's entire span with equal weight distribution. In that case, the trailer would need to be hauling materials that run the entire length of the trailer, such as long steel poles, lumber or concrete culvert sections. 

However, if the payload is a 100,000-pound excavator that's only 13 feet long, a trailer rated for the entire deck length, or even for 16 feet, won't be right for the load. Even though the load is only 50 tons, that trailer will be overloaded because the weight will not span the entire length of the deck; making it too concentrated for the area the excavator covers. For a trailer that's rated at full deck length or 16 feet to safely handle the excavator, it would likely need to be rated at 55 or 60 tons. 

So again, using the 13-foot, 100,000-pound excavator as the payload, the ideal trailer will be one rated at half the deck length. Trailers rated for half the deck length can carry a specified load in just that, half the length of the deck. These ratings give a more realistic indication of the concentrated loads the trailer will be able to handle safely and without structural failure. In addition, manufacturers who build trailers with half-deck ratings often do so with a two-point rigid load base specifically for the tire spacing, or hot spots, of large equipment and heavy machinery. 

Load Distribution:  Scaling Out
How a load is distributed over the deck and the axles can be just as important as the overall weight rating. However, even though the trailers will be operating in the United States, the states are not very united when it comes to axle weight laws and regulations. 

All across the country, the laws and regulations related to weight change from state to state. Companies operating in Indiana deal with one set of laws and regulations, but when they cross the border into Ohio they run into entirely different set of regulations. Pennsylvania has yet another distinct collection of rules of the road and so on along the truck's route.

Fleet managers need to be aware of, and plan for, variances between states and regions where their trailers will be used. It's important to have the proper trailer configuration to make the load distribution work for a fleet's particular area of operation. Manufacturers bear some responsibility, too, and should work with buyers to define not just the best trailer for the cargo those buyers will be carrying, but also the best axle configurations for maximizing the load in every one of the states they'll be hauling through. 

Clearly, it's impossible to max out a trailer's capacity in every state, but the goal of most interstate heavy-haul carriers is to get a trailer as close to the maximum as possible across all the states where the carrier intends to operate. 

There are many ways to achieve the best possible weight distribution over the axles. It may be as simple as adding a fourth flip axle or as complicated as adding two or three axles and spreading them apart to make sure they can each accept an equal amount of weight from the payload. And there are other possibilities in between depending on the specific state's regulations and the nature of the load.

For example, carriers can vary gooseneck lengths in the front to achieve the proper steer weight and drive axle weight. Carriers also can alter the distances between axles and axle groups to hit max weights and remain in compliance with various state laws. With an East Coast trailer, for example, they can add shims to a rigid spread bar or, if the trailer has a nitro version of a spreader bar, use hydraulics to vary the weight distribution. Yet another way is to move the load closer to one end or the other to properly distribute weight over the axles. And, finally, a carrier can use a jeep dolly to add extra axles, thereby lowering the per-axle weight distribution.

Speed:  How Slow Can You Go?
Another capacity determinant is speed. While some manufacturers rate their trailers at 55 mph, others rate them at 65 mph. The slower a rig travels, the less added weight or stress is placed on the trailer. That's due to the fact that, while road dynamics such as potholes, railroad tracks and so on still come into play, the impact on the trailer decreases along with the speed. However, sometimes a 55 mph rating is not as realistic for a carrier as a 65 mph rating. The key is to purchase trailers that will perform at a fleet's normal operating speeds.

Safety:  A Crucial Multiplier
A trailer's safety rating also comes into play when discussing capacity. Without understanding the safety rating, it's difficult for a carrier to get a clear, comprehensive picture of true capacity. 

A safety rating is an indicator of how much stress a trailer can safely handle. It encompasses the strength of the raw materials and components that a manufacturer has put into the trailer's design and construction, how the beams and cross members are configured and so on. 

A widely accepted average magnification of payload weight on a trailer due to road dynamics is 1.8 to 1 ratio. When a driver is rolling down the road, the truck is hitting chuckholes, bouncing over bumps and crossing railroad tracks along the way. On average, the stress placed on a 50-ton-rated trailer by a 50-ton load when the rig hits those bumps, chucks and tracks equals 1.8 times 50 tons, or 90 tons. 

It's important to keep in mind that the 1.8 multiplier is only an average. On any given haul, the stress placed on the trailer can go above that level multiple times. If no cushion is built in to the trailer to handle those spikes in stress, there will be more potential for long-term, progressive structural damage. 

Since there is no universally prescribed level for safety ratings, they vary from manufacturer to manufacturer. They range from a safety factor of 1.8 to 1, which allows for no margin, to an industry high of 2.5 to 1, which is considered an ample cushion for even the most extreme road dynamics a trailer might encounter.

Not only does the safety rating tell a carrier how strong his trailer is, it's also a very good indicator of potential life. The greater the difference between the static design safety factor, be it 2.5 to 1, 2 to 1 or some other factor, and the dynamic 1.8 average multiplier, the longer one can expect a trailer's useful life expectancy to be.

Most trailer manufacturers do not like to advertise safety ratings, often for good reason. To understand why, it's helpful first to comprehend what a safety rating is not. A safety rating should never be used to determine how much weight can be added over the capacity rating and still keep the load, the driver and other drivers safe. In other words, a 2.5 to 1 safety rating on a 50-ton lowbed should not be used to justify loading a trailer with 125 tons of cargo. Just as the deck rating indicates, that trailer can safely handle a 50-ton payload under dynamic conditions. 

Materials: The Sum of the Parts
Safety factors are strongly related to the quality of the components incorporated into the trailer, and that gets down to the nitty-gritty of the steel and the deck material.

Manufacturers have several options when choosing steel. For the most capacity and smallest impact on the trailer weight, some manufacturers use a T1 material with 100,000 psi minimum yield.  T1 not only has maximum strength versus ductility, but also equates to a lighter, stronger trailer frame over other materials.

A trailer's decking is continually exposed to the elements, making durable decking with a long wear life also crucial. Apitong decking provides a tougher, longer lasting wood in comparison to other varieties, such as oak or pine. Tightly woven and incredibly dense, apitong is less susceptible to chipping and cracking and provides some amount of traction in comparison to a smooth metal surface.

Overload at Your Own - and Others' - Risk
Sometimes trailer owners or operators don't completely understand the capacity rating and mistakenly put more weight on the trailer than it is built to handle, or more weight in a concentrated area than it can handle. 

Overloading a trailer once is not likely to make it break. Overloading it twice probably won't either. But do it consistently over time and eventually it will likely fail. 

When a trailer breaks, the manufacturer hears about it. But often the complaint will be that a 50-ton trailer broke when it was hauling less than a full payload. For example, a 50-ton trailer might break when it's only hauling a 40-ton payload. The reason is not in that 40-ton load, but the number of times the trailer previously was overloaded and by how much each overload exceeded the yield strength of the trailer's load-bearing beams and cross members.

Yield strength refers to the amount of stress that the steel can withstand and still return to its original shape when unloaded. The first time a trailer is overloaded, the steel will return to something close to the shape it was in when it came off of the manufacturing line, but not exactly to that original shape. Each time it's overloaded, the steel will return to something less than the shape it was in the time before. Eventually, the steel, and therefore the trailer, will break.

So in our example, even though the trailer only carried a 40-ton payload, it is likely that it had been overloaded to some extent at one or more points in its past. That's when the damage was done, and that is what ultimately caused the failure. The steel got weaker and weaker and, on the day the trailer failed, it happened to be rolling with 40 tons on the deck.

Help To Be Had
It can be tempting to look at a trailer's capacity rating and stop there. But for a true sense of how much a trailer can handle and how it will hold up under the stresses of a specific operation, with its individualized loads, geographies, weights and other variables, fleet managers need to consider everything that goes into that rating. 

Purchasing the right trailers for updating a fleet can be complicated and, clearly, the decision is an important one. But there is help available. Many manufacturers have sales people who know capacity from top to bottom and can help fleet managers select exactly the right trailer with the optimal combination of load concentration, load distribution, speed and safety rating for specific applications and load types. 

And having that knowledge about each specification will help ensure an investment that leads to a long, smooth ride.

Troy Geisler is the vice president of sales and marketing for Talbert Manufacturing. He has more than 10 years of experience in trailer sales, including three years with Talbert. Troy earned his bachelor's degree from Purdue University in West Lafayette, Indiana.

Company Info

  • Talbert Manufacturing, Inc.

    1628 W. State Rd. 114
    Rensselaer , IN
    US , 47978

    Talbert has been building world-class heavy-haul and specialized trailers to rigorous customer specifications since 1938. The company offers complete lines of heavy-haul trailers and specialized transportation equipment for the commercial, industrial, military and government sectors. Its trailers and equipment are used in applications as diverse as renewable energy, aerospace, heavy construction, in-plant material handling, manufacturing and processing systems and much more. 

    Read more

Latest News

Tags
Industry News
Pipelines

City request to stop work at Trans Mountain terminal denied by NEB

In its decision, the NEB found that the piping modifications at the Burnaby Terminal are not associated with the Expansion Project and that the relocation and decommissioning Orders appropriately allow Trans Mountain to optimize the site in preparation to offer new services to shippers.

The NEB has rejected a request by the City of Burnaby to rescind two Orders that authorize Trans Mountain Pipeline ULC to undertake pipeline relocations and decommissioning works at its Burnaby Terminal. The decision enables the company to continue its ongoing work to modify existing piping and related infrastructure within the facility.

Read More

Tags
Industry News

Bureau Veritas awarded major inspection contract for new oil field development

The frame agreement between Bureau Veritas and operator Neptune Energy will run until December 2022 and, as the development progresses, it may see Bureau Veritas provide third-party inspection services in Newcastle, Evanton, Le Trait, Ulveston, and other European locations and further afield globally.

Bureau Veritas, a leader in laboratory testing, inspection and certification services, has been awarded a four-year contract with Neptune Energy to provide second and third-party inspection services for the new Fenja oil and gas field development, offshore Norway.

Read More

Tags
Drilling & Production
Industry News
Offshore Technology

Subsea Integration Alliance receives EPCIC contracts offshore Australia

The OneSubsea scope includes the provision of two vertical monobore on-wellhead production trees, wellheads, controls and installation and commissioning services.

Subsea Integration Alliance has announced the award of integrated subsea engineering, procurement, construction, installation and commissioning (EPCIC) contracts. These awards, by Esso Australia Pty Ltd, represent the first integrated subsea project for Subsea Integration Alliance in Australia combining OneSubsea and Subsea 7 expertise in subsea production systems (SPS) and subsea umbilical, riser and flowline (SURF) systems.

Read More

Tags
Industry News

Packers Plus successfully installs more than 200 PrimeSET liner hangers in North America

The PrimeSET Liner Hanger is designed for challenging applications. This technology can handle high torque, carry heavy weight and provides the ability to rotate, push and pull the liner while running in-hole without an early release of the running tool.

Packers Plus Energy Services Inc. has successfully installed the TREX PrimeSET Liner Hanger system in 216 wells across North America. This liner hanger system, which can be used in both cemented and open hole applications, is engineered with unique anti-preset features to ensure reliability and performance, resulting in time and cost savings for operators.

Read More

Tags
Instrumentation, Systems & Automation

Ametek introduces AMEVision communication and display system capability for 3050 moisture analyzers

The 3050 series analyzer can be pre-configured at the factory to directly communicate with AMEVision, eliminating the need to set it up, which will ultimately save time in the field.

AMETEK has broadened its AMEVision communication and display system capabilities to include the 3050 series of moisture analyzers. Originally designed for WDG-V analyzers, the AMEVision system provides real-time moisture measurements and trend data while also detailing a variety of maintenance and troubleshooting information.

Read More

Tags
Industry News
Shows & Events

New work trucks and equipment rolling out at The Work Truck Show 2019

Show attendees will have the opportunity to check out products from 26 first-time exhibitors in a special New Exhibitor Pavilion that opens an hour before the exhibit hall on Wednesday, March 6 and Thursday, March 7. It’s located across from the Hall I exhibit hall entrance.

More than 100 companies have already announced plans to introduce new work trucks and equipment at Work Truck Week 2019.

Read More

Tags
Industry News
Occupational Health & Safety

Optical gas imaging tools for the oil and gas industry

An optical gas imaging camera is a highly specialized version of an IR or thermal imaging camera. It consists of a lens, a detector, electronics that process the signal from the detector, and a viewfinder or screen for the user to see the image produced by the camera.

Infrared (IR) thermal imaging cameras have been used for decades for a variety of oil and gas applications, including electrical/ mechanical inspections, tank level inspections, and even examinations of pipe integrity within process equipment. In recent years, new optical gas imaging (OGI) technology has been developed which can "see" hydrocarbon gases and volatile organic compounds (VOCs) that are venting or leaking to the atmosphere. OGI can be used for meeting regulatory emission reduction requirements, while also helping to reduce product loss, which in turn provides positive return on investment. OGI cameras are a huge time saver compared to other inspection technologies and also offer safety advantages for operators. Major energy companies are using OGI cameras like the FLIR GF320 to quickly check thousands of components and identify potential gas leaks in real-time.

Read More

Tags
Instrumentation, Systems & Automation

KROHNE to manufacture OPTIMASS twin bent tube coriolis mass flowmeter

The OPTIMASS 6400 has been approved for custody transfers of both liquids and gases, making it ideal for process industries and specialist applications like LNG, CNG, or supercritical gases in terminal or storage/bunkering, along with custody transfer applications.

KROHNE, Inc. announces that it has begun manufacturing the OPTIMASS 6400 twin bent tube Coriolis mass flowmeter at its newly opened state of the art flow and level instrument manufacturing and calibration facility located in Beverly, MA. The OPTIMASS 6400 is ideal for standard liquid and gas applications in the chemical and petrochemical, oil and gas, pharmaceutical, food and beverage, and energy and power industries. The OPTIMASS 6400 is equipped with a new signal converter that features advanced device and process diagnostics, compliant to NAMUR NE 107.

Read More

Tags
Industry News

COSIA seeks presenters for Oil Sands Innovation Summit

We encourage submissions from academia - both students and faculty, companies of all sizes, associations, government, research organizations, and individuals who are advancing technologies in the four environmental areas: Land, Water, Tailings and Greenhouse Gases.

Canada's Oil Sands Innovation Alliance (COSIA), Alberta Innovates and Emissions Reduction Alberta (ERA) are seeking presenters to share their research or project results, knowledge and experience at the 2019 Oil Sands Innovation Summit.  

Read More

2019 Ram Heavy Duty provides benchmark for performance and capability

The standard engine in the 2019 Ram 2500 and 3500 Heavy Duty is upgraded to the proven and potent 6.4-litre HEMI V8, delivering class-leading 410 gas horsepower @ 5,600 rpm and 429 lb.-ft. of torque @ 4,000 rpm to handle the payload and towing requirements of the heavy-duty truck user.

The 2019 Ram Heavy Duty is the most powerful, most capable pickup in the segment, according to the manufacturer, with a towing capacity of 15,921 kg (35,100 lbs.) and a payload capacity of 3,484 kg (7,680 lb.). Driving it all is a never-before-seen torque rating of 1000 lb.-ft. from the Cummins 6.7-litre High Output Turbo Diesel engine. The new Ram Heavy Duty also sets benchmarks in ride and handling, luxury, materials, innovation, and technology extending well past any competitive offerings. 

Read More

Tags
Pipelines

T.D. Williamson introduces 4-inch inspection tool for small diameter, low pressure pipelines

According to Tod Barker, Senior Product Manager, Pipeline Integrity, the 4-inch tool overcomes challenges associated with conventional MFL inspections, such as difficulty navigating tight bends and speed excursions that limit data accuracy.

T.D. Williamson (TDW) has commercialized a 4-inch magnetic flux leakage (MFL) + deformation (DEF) + internal versus external discrimination (IDOD) tool that helps ensure pipeline integrity by detecting pitting and general corrosion as well as interacting features such as dents with metal loss in small diameter, low pressure pipelines.   

Read More

Portable vehicle scales​ help heavy-haul carriers stay compliant

Heavy-haul carriers transport oversized objects using public roadways. While these loads may weigh hundreds of thousands of pounds, operators must still comply with permitted limits, while also completing their job safely. Intercomp has a variety of options to fill this unique application for a range of applications including construction, oil & gas, waste and recycling, heavy-haul transportation and electrical utility.

Read More

Tags
Industry News

Allen Engineering promotes Kyle Baker to national sales manager

In his new position, Baker will be responsible for managing, training and recruiting all the Allen direct sales personnel as well as the independent sales representatives that sell Allen Equipment in the United States and Canada.

Allen Engineering Corp. recently announced that Kyle Baker has been promoted to national sales manager for all sales operations in the United States and Canada.

Read More

Tags
Industry News
Power Systems

Encana selects Siemens to provide rotating equipment for Pipestone Processing Facility

Siemens’ SGT-750 turbine offers customers lower life cycle costs compared to competing turbines in the industry.

Siemens was recently selected to provide one feed and sales gas train and one refrigeration compression train for Encana's Pipestone Processing Facility in Grand Prairie, Alberta, Canada. Designed to accommodate future capacity expansion, the Pipestone Processing Facility will provide Encana with 19,000 barrels per day of net raw condensate processing capacity plus 170 million cubic feet per day of net inlet natural gas processing capacity. Keyera will own the Pipestone Processing Facility and provide processing services to Encana. The Facility will have total processing capacity of 200 million cubic feet per day and is expected to start up in 2021.

Read More

Tags
Industry News
Pipelines

TransCanada plans name change to TC Energy

TransCanada Corporation has announced its intention to change its name to TC Energy to better reflect the scope of the company's operations as a leading North American energy infrastructure company. TransCanada's shareholders will be asked to approve a special resolution to change the name at the company's next Annual and Special Meeting of Shareholders.

Read More

Tags
Industry News

Husky considering sale of non-core downstream assets

Husky's retail and commercial network consists of more than 500 stations, travel centres, cardlock operations and bulk distribution facilities from British Columbia to New Brunswick. The myHusky Rewards loyalty program has about 1.6 million members.

Husky Energy will undertake a strategic review and will potentially sell its Canadian retail and commercial fuels business and its Prince George Refinery.

Read More

Tags
Industry News

Seeq announces availability of R21 with new scorecard and FFT analytics

Seeq now supports Fast Fourier Transform (FFT) and expanded reporting capabilities in latest release, increases headcount to support larger and worldwide customer deployments.

Seeq Corporation announces the availability of their latest release, R21, an advanced analytics solution for process manufacturing customers. Seeq enables engineers and scientists in process manufacturing organizations to rapidly analyze, predict, collaborate, and share insights to improve production outcomes. Customers include companies in  oil & gas, chemical, energy, mining and other process industries.

Read More

Tags
Industry News
Pipelines

Demand to drive Canadian oil prices higher in 2019: Deloitte

Deloitte notes that Canadian oil prices should also strengthen in 2019 because of improved export capacity as a result of the Alberta government's plan to purchase additional rail cars to transport crude oil and the expanded capacity of Enbridge's Line 3 pipeline, which transports a variety of Canadian crude oil to the United States.

Prices for Canadian heavy and light oil should improve somewhat in 2019 because of increased demand from refineries in the United States, improving transportation capacity and mandatory productions cuts in Alberta, according to Deloitte's Resource Evaluation and Advisory (REA) group. In its latest report, Deloitte says these factors should begin to reduce the current oversupply of Canadian oil and help narrow the larger-than-usual differentials with WTI prices that were present in the final quarter of 2018.