Oil & Gas Product News Logo

Oil sands forecast shows production increase but lower annual growth: IHS

Total oil sands production will be nearly one million barrels higher by 2030 though lower annual growth rates will be the “new normal”

IHS Markit expects average year-on-year supply additions to be below 100,000 barrels per day (b/d) in the coming decade. By contrast, growth over the current decade regularly averaged additions in excess of 150,000 b/d.
IHS Markit expects average year-on-year supply additions to be below 100,000 barrels per day (b/d) in the coming decade. By contrast, growth over the current decade regularly averaged additions in excess of 150,000 b/d.

Company info

4th floor Ropemaker Place
25 Ropemaker Street
London,
GB, EC2Y 9LY

Website:
ihsmarkit.com

Read more

Canadian oil sands production is set to enter a period of slower annual production growth compared to previous years. Nevertheless, total production is expected to reach nearly four million barrels per day (mbd) by 2030 - nearly one million more than today, according to a new 10-year production forecast by business information provider IHS Markit.

IHS Markit expects average year-on-year supply additions to be below 100,000 barrels per day (b/d) in the coming decade. By contrast, growth over the current decade regularly averaged additions in excess of 150,000 b/d.

Transportation constraints such as a lack of adequate pipeline capacity and the resulting sense of price insecurity in western Canada have weighed on new large scale incremental investments in the oil sands, said Kevin Birn, vice president, IHS Markit - who heads the Oil Sands Dialogue.

"Large scale oil sands projects take two, three, four or more years to be brought online and so the reality of a slower pace of investment and growth in the Canadian oil sands is taking shape," Birn said. "Yet, ironically the call on Canadian heavy sour crude oil—the principal export from the Canadian oil sands—has never been greater as the rapid deterioration of Venezuelan output tightens the supply of heavy sour crude globally."

A fuller analysis of the new IHS Markit oil sands production forecast, authored by Kevin Birn is available at the IHS Markit energy blog.

IHS Markit not only expects the growth profile for oil sands to be different in the coming decade but the drivers of growth will also be fundamentally different. Future growth will mostly come from existing projects and facilities as opposed to new projects, according to the forecast.

The 10-year forecast expects two-fifths of the anticipated rise in oil sands production to 2030 will come from ramp-up of projects in construction or recently completed. Nearly one-quarter of the growth will come from projects that are on hold but where some construction or site clearing has already begun and de-bottlenecking of existing operations. Less than one-third of anticipated growth is expected to come from "new projects," IHS Markit says.

The shift towards more modest year-on-year gains had been expected to occur earlier, with IHS Markit anticipating that 2019 would be the pivot point. However, the decision by the Government of Alberta to artificially reduce output via a curtailment policy has deferred some of the anticipated production gains that would have occurred in 2019 to 2020.

Despite the forecast for slower rates of growth, there is still upside potential in the coming decade for the Canadian oil sands, Birn said.

"The key to unlocking further upside growth potential in the Canadian oil sands will be the ability of the government and industry to restore confidence that the crude oil produced in western Canada can get to markets at a reasonable transportation cost," he said.

More from Industry News

CAS DataLoggers provide unique safety support in chemical plant

CAS DataLoggers provided a unique gas monitoring and temperature monitoring solution for an international chemical company, where health and safety was an important consideration. Harmful gas detection was placed high on the list of priorities: hydrochloric acid gas was produced when a standard chemical made by the company leaked to the atmosphere as fumes, while chlorine was used as a raw material at the plant. Therefore, it was necessary to monitor and record both hydrochloric acid gas levels (HCL) and chlorine (CH2) levels. 

Alberta launches support for indigenous groups to enter energy sector

Alberta Bill 14, the Alberta Indigenous Opportunities Corporation Act introduced recently, would set up a first-of-its-kind Crown corporation to facilitate Indigenous investments and job creation. The AIOC would make it easier for Indigenous communities to access funding, invest in major natural resources development projects and fuel their prosperity while helping to grow Alberta's natural resource sectors.

C3 Oleflex technology helps with first contract for propane dehydrogenation technology in Turkey

Honeywell announced that Ceyhan Polipropilen Üretim A.Ş. will use Honeywell UOP's C3 Oleflex technology to produce 457,000 metric tons per year of polymer-grade propylene for a new petrochemicals complex in Ceyhan, Turkey. Ceyhan Polipropilen Uretim is a joint venture of Rönesans Holding and the Algerian national energy company Sonatrach S.p.A. The new unit will be used to supply propylene for production of polypropylene, which is used to make a wide variety of plastic products that are growing in demand globally.

September 2019 international rig count released by Baker Hughes

Baker Hughes, a GE company announced that the Baker Hughes international rig count for September 2019 was 1,131, down 7 from the 1,138 counted in August 2019, and up 127 from the 1,004 counted in September 2018. The international offshore rig count for September 2019 was 242, down 2 from the 244 counted in August 2019, and up 38 from the 204 counted in September 2018. 

TransAlta, SemCAMS Midstream to build Alberta cogeneration plant

TransAlta Corporation and SemCAMS Midstream ULC, a subsidiary of SemGroup Corporation, have entered into definitive agreements to develop, construct and operate a new cogeneration facility at the Kaybob South No. 3 sour gas processing plant. The Kaybob facility is strategically located in the Western Canadian Sedimentary Basin and accepts natural gas production out of the Montney and Duvernay formations. TransAlta will construct the cogeneration plant which will be jointly owned, operated and maintained with SemCAMS. The capital cost of the new cogeneration facility is expected to be approximately $105 million and the project is expected to deliver approximately $18 million in annual EBITDA. TransAlta will be responsible for all capital costs during construction and, subject to the satisfaction of certain conditions, SemCAMS will purchase a fifty percent (50%) interest in the new cogeneration facility as of the commercial operation date, which is targeted for late 2021.

Subscribe to our free newsletter

Get our newsletter

Learn more

Universal mCloud offers 3D digital twin capabilities to Alberta customers

Universal mCloud Corp. (TSX-V: MCLD) (OTCQB: MCLDF) ("mCloud"   or the "Company"), a leading provider of asset management solutions combining IoT, cloud computing, artificial intelligence ("AI") and analytics, today announced the launch of a new AssetCare™️ solution under the banner of the "3D Digital Twin." This solution enables mCloud to take advantage of high-precision 3D laser scanners to create digital replicas of facilities along with a suite of capabilities designed to use these 3D models to streamline field work, minimize facility downtime, and eliminate unnecessary field visits.

Armor cladding alloy now available from Schlumberger for drill bits

Smith Bits, a Schlumberger company, has introduced Aegis armor cladding that significantly improves bit body design flexibility and erosion resistance, increasing rate of penetration (ROP) and bit durability for longer runs. Composed of a proprietary tungsten carbide material, Aegis cladding increases bit erosion resistance by 400% and strength by 40% when compared to conventional matrix polycrystalline diamond compact (PDC) bits.

Melius Energy successfully tests new bitumen shipping approach

Calgary based Melius Energy has successfully transported bitumen from Edmonton, Alberta to Prince Rupert, British Columbia, continuing to global markets in custom 20-foot shipping containers utilizing intermodal rail and vessel infrastructure. The shipment is the company's first BitCrude transportation process demonstration, proving the ability to move bitumen safely and efficiently, in adherence to Canada's regulatory framework.    

Advanced production modeling and reservoir engineering software solutions from Emerson on display

Emerson will showcase its advanced Exploration & Production (E&P) software solutions for optimizing Production Modeling and Reservoir Engineering workflows at the Society of Petroleum Engineers Annual Technical Convention and Exhibition in Calgary, September 30 - October 2.  Daily demonstrations at booth #819 will highlight Emerson's technologies for solving subsurface and surface challenges, to reduce uncertainty and enhance confidence in drilling decisions.

Pipestone gas plant officially commissioned by Tidewater

Tidewater Midstream and Infrastructure Ltd. has announced that it completed commissioning and start-up of the Pipestone Montney sour deep-cut gas processing complex.  The Pipestone Gas Plant is designed to process approximately 100 MMcf/day of sour gas and includes an acid gas injection well, salt water disposal well, and pipelines that directly connect to Tidewater's Pipestone Gas Storage Facility.  Additionally, the Pipestone Gas Plant is connected to both the Alliance and TC Energy pipeline network.

Subscribe to our free magazine

Get Our Magazine

Paper or Digital delivered monthly to you

Subscribe or Renew Learn more

$2 billion TransAlta energy investment move to include natural gas over coal

TransAlta Corporation has introduced its Clean Energy Investment Plan, which includes converting its existing Alberta coal assets to natural gas and advancing its leadership position in renewable energy. The total cost of the plan is expected to be approximately $2 billion which includes approximately $800 million of renewable energy projects already under construction.

Oversupply of natural gas to push U.S. prices sharply down: IHS Markit

A persistent oversupply of natural gas will drive the 2020 average price at the Henry Hub down (in real terms) to a level not seen in decades, according to new report from IHS Markit. The oversupply—to be reinforced by a new surge in associated gas production from the Permian basin—will push the average price down below $2/MMBtu for the year, IHS Markit said. That is the lowest prices have averaged in real terms since the 1970s. In nominal terms, the last time that prices fell below $2 was 1995.

Oil and gas PPE landscape shows positive outlook, says Frost & Sullivan

The outlook for the uptake of personal and protective equipment (PPE) in the oil & gas (O&G) industry looks promising with the expansion of O&G activities through new global projects, improved stability and the presence of many occupational hazards. Vendors should focus on developing a global presence, multiproduct offerings, and close customer interactions to harness current growth opportunities. Frost & Sullivan expects the mature O&G PPE market to grow at a compound annual growth rate (CAGR) of 3.7% to reach $7.59 billion by 2023.

Subscribe to our free newsletter

Get our newsletter

Learn more

$1.4 billion power cogen plant planned for Suncor's oil sands base plant

Suncor is replacing its coke-fired boilers with two cogeneration units at its Oil Sands Base Plant. The cogeneration units will provide reliable steam generation required for Suncor's extraction and upgrading operations and generate 800 megawatts (MW) of power. The power will be transmitted to Alberta's grid, providing reliable, baseload, low-carbon power, equivalent to approximately 8% of Alberta's current electricity demand. This project will increase demand for clean natural gas from Western Canada.

August shows slight yearly increase in Canadian rig count

Baker Hughes, a GE company announced that the Baker Hughes international rig count for August 2019 was 1,138, down 24 from the 1,162 counted in July 2019, and up 130 from the 1,008 counted in August 2018. The international offshore rig count for August 2019 was 244, down 11 from the 255 counted in July 2019, and up 32 from the 212 counted in August 2018.

Clariant marks opening of new high throughput experimentation lab

Clariant has opened its next High Throughput Experimentation (HTE) Laboratory in Houston, Texas - the energy capital of the United States. The location is key as the new facility will be the first of its kind supporting the Oil & Gas industry, offering new and sophisticated solutions for customers. This lab is part of a global Clariant initiative to expand HTE capabilities to all Clariant Business Units, including direct support for Oil Services in North America, the Asia Pacific region, Latin America, Africa and the North Sea.

Subscribe to our free magazine

Get Our Magazine

Paper or Digital delivered monthly to you

Subscribe or Renew Learn more