Oil & Gas Product News Logo

Metal-to-metal sealing avoids costly casing misrun in North Sea project

Metal-to-metal sealing avoids costly casing misrun in North Sea project

A North Sea operator's well design required 9 5/8-in casing to surface with metal-to-metal connections throughout. Wellbore instability was a common occurrence in the field, and the 3,604-m interval included 728 m [2,388 ft] of open hole that was likely to hinder access.

Long, heavy casing strings require extremely high torque to rotate, making it difficult to ream with casing and increasing the likelihood of multiple attempts—interspersed with wiper trips—to run the casing string to depth.

To minimize rig time and optimize costs, the alternative was to install a shorter, lighter liner across the unstable openhole section and tie it back to the wellhead with a separate tieback string. However, conventional liner equipment does not provide the metal-to-metal, gas-tight connection required.

Proprietary sealing technology enabled use of ream-down liner

Schlumberger proposed a liner system with a setting adapter and a metal-to-metal, gas-tight liner tieback system that uses Metalmorphology sealing and anchoring technology. This full-axial-load- bearing, V0 ISO 14310-certified system connects a liner to a tieback string of casing with a permanent, durable seal.

Operator achieved integrity of full casing string to surface with zero NPT

The proprietary technology enabled the operator to run the lower part of the casing as a liner on drillpipe, with all the advantages of push, pull, rotation, and circulation to address borehole restrictions and reach TD in one run. Subsequently, the tieback string was run in hole with the liner tieback system stinger on the bottom. The stinger was expanded into the tieback system receptacle at the top of the liner, achieving the required V0-rated, metal-to-metal downhole casing connection integrity.

Compared with running a long casing string to depth and assuming at least one wiper trip to recondition the hole during the process, the innovative Schlumberger system saved an estimated 5 days of rig time. The operator plans to use this system on other wells in the field.

Company info

1325 S. Dairy Ashford Dr.
Houston, TX
US, 77077

Website:
slb.com

Read more

More from Drilling & Production

Sponsored Brought to you by: Globalstar Canada Logo

Opening New Windows into Remote Asset Management and Worker Safety with Satellite Communications

Industries such as construction, mining, energy, utilities and forestry, face many challenges when it comes to tracking assets and employees. Equipment often has to be transferred between locations, or monitored while it is dormant during off seasons. Lone workers may have to travel long distances or visit multiple sites during the course of their activities. And, all of this is further complicated today with shifting supply chains and economic realities putting further strain on the bottom line. 

Learn more

Get our newsletter

Subscribe to our free magazine

Get Our Magazine

Paper or Digital delivered monthly to you

Subscribe or Renew Learn more

Get our newsletter